• Start Building Cash Flow

    For more information call (780) 691-8368
  • Project: Remove Mold and Fix Damages

    Location: Edmonton

    Basement bathroom

    A basement bathroom was built on a sub-floor. The toilet had a leak the went under the tile and onto the sub-flooring and migrated to the bedroom flooring. Suite Builder removed all damaged flooring and 2 layers of sub floor to the concrete. Replaced all with new material. Including vanity, counter top and a fresh new look.